The rank order of the activities to be completed are:
- Work on ongoing project
- Investigate customer issue
- Complete Online Training
- Attend team meeting
<h3>How to order the events?</h3>
From the complete question (see attachment) the events must be ordered based on their priorities, followed by the time and then impact.
Using the above highlight, the events with the top priorities are:
Events 1 and 2
The events with the most number of hours are:
Events 1 and 2
Event 4 has more priority than event 3.
So, we have the following order
1, 2, 4 and 3
Read more about ranks and orders at:
brainly.com/question/20771129
#SPJ1
Without knowing anything else about
, neither of these need be true.
Suppose

Then (I) isn't true because, while the limit exists as
and is equal to 7, we have
, so
is not continuous there.
(II) also true because
is not differentiable at
; that is,

but

which means the derivative does not exist at
.
Given: f(x) = x² + 2x - 2
Add 2 to both sides: f(x) + 2 = x² + 2x
Complete the square: f(x) + 2 + (1) = x² + 2x + (1) → f(x) + 3 = (x + 1)²
Subtract 3 from both sides: f(x) = (x + 1)² - 3
Answer: B
Since the side of the square frame is 15x, the area of the frame in whole would be:
(15x)² = 225x²
Now if we subtract out the circle mirror with a radius of 5x, we get:
225x² - πr²
225x² - π(5x)²
225x² - π25x²
We can factor out a 25x² and get:
25x² (9 - π)