Answer:
Step-by-step explanation:
4/18×2/92
=1/9×1/23
=1/207
1/9×3/63
=1/3×1/23
=1/69
12/14×1/84
=1/14×1/7
=1/98
1/7×5/65
=1/7×1/13
=1/91
17/20×1/61
=17/1220
4 1/4 ×3 1/22
=17/4×67/22
=1,139/88
=12 83/88
3 5/6×4 1/23
=23/6×93/23
=93/6
=15 3/6
=15 1/2
2 1/2×4 7/84
=5/2×343/84
=1715/168
=10 35/168
I have answered more than 2 from each set
Let number of hours needed to work = x
Multiply number of hours by rate: 15x
Add what you already have saved:
15x + 215
This needs to equal at least 800:
The equation becomes:
15x + 215 >= 800
Solve for x:
15x + 215 >= 800
Subtract 215 from both sides
15x >= 585
Divide both sides by 15
X >= 39
They have to work at least 39 hours.
Answer:
a) 279 b)254
Step-by-step explanation:
Mean = 269 days
standard deviation = 8 days
let n be the pregnancy lenght.
using normal distribution formula
z = (n – mean)/ standard deviation
n = z * standard deviation + mean
Now, z values for the top 12% has to be found using a z table.
The top 12% means 88% of area under the curve. In this case z = 1,176
n = 1,176 * 8 + 269
n = 278.4 = 279
The bottom 3% means 97% of area under the curve. In this case z = -1,882
n = -1,882 * 8 + 269
n = 253.94 = 254
So if you do 8x14=112 is the area. So 112 divided by 40= 2.8. He will need 2.8 pints of paint.