Answer:
11 and 11
Step-by-step explanation:
brainliest^:)
The <u>correct answer</u> is:
B) The variables are height and time. For the first part of the graph, the height is increasing slowly, which means the hiker is walking up a gentle slope. Flat parts of the graph show where the elevation does not change, which means the trail is flat here. The steep part at the end of the graph shows that the hiker is descending a steep incline.
Explanation:
The variables are marked on the graph. Time is marked along the x-axis, which means it is the independent variable. Height is marked along the y-axis, which means it is the dependent variable.
The first part of the graph rises slowly. This means the elevation does not change much over the time; this would be consistent with a gentle slope being climbed.
The flat areas are where the elevation does not change. This would be consistent with the hiker resting.
The steep decrease at the end shows that the elevation goes down quickly. This is consistent with the hiker climbing down a steep slope.
I would divide the 18000 by 13.26 to get the number of hours needed.
18000/13.26~169.7 days with 8 hour shifts.
If they're integers, that means they can't be fractions (such as 15/2 and 2).
So the only couples of integers that, when multiplied, result in 15 are:
1 and 15
5 and 3.
(there are no other possibilities as both 5 and 3 are not divisible further).
The smaller of the two sums (15+1; 5+3) is 5+3=8.
The least possible sum of a and b is 8.