Answer:
0.98732
Step-by-step explanation:
Given that :
Mean = 10 minutes
Variance = 2 minutes
For less than equal 40 jobs
Mean (m) = 40 * 10 = 400 minutes
Variance = 2 * 40 = 80 minutes
Standard deviation (s) = √variance = √80
Converting hours to minutes
X = 60 * 7 = 420 minutes
P(X≤ 420) :
Z = (x - m) / s
P(X≤ 420) :
Z = (420 - 400) / √80
Z = 20 / √80 = 20 / 8.9442 = 2.236
P(Z ≤ 2.236) = 0.98732
Answer:
I don't have the graph, but I'll explain what you need to do. Plot a point with the coordinates (1,3.5), (2,7), (3,10.5), and (4,14). Now draw a straight line connecting al these pints but don't go past the origin into the negative as in this situation it is not possible. There! Now you have a graph :)
Answer:
A
Step-by-step explanation:
Use the quadratic formula
No, it's simplest form would be 2/5.