The answer is 140
Explanation:
1,400 x 10= 14,000
140,000\100=1,400
1,400 x 100= 140,000
Answer:
Add 7 black beads
Step-by-step explanation:
Since we can only change the number of black beads, decide how many black beads you will add based on how many white beads there are.
There are three white beads in the picture.
Total beads we will have (<em>b</em> meaning black) b : 3
Ratio black : white beads 3 : 1
Use the common ratio, which is a number that both sides of the original ratio multiply by to get to the new ratio.
Find common ratio by dividing total by ratio white beads: 3/1 = 3
Multiply ratio black beads by common ratio. 3 X 3 = 9
<u>We need 9 black beads in total</u>.
Check answer
9 : 3 Both sides divisible by 3; reduce ratio
= 3 : 1 Correct ratio
There will be a total of 9 black beads, but we already have 2 black beads:
(9 total) - (2 original) = (7 to add)
Therefore we need to add 7 black beads.
Answer:
The speed is still water is
.
Step-by-step explanation:
Dimentionally speaking, speed is distance divided by time. Since, the person is travelling downstream, absolute speed is equal to the sum of current speed and speed of the person regarding current. Both components are constant. That is:

Where:
- Current speed, measured in miles per hour.
- Speed of the person regarding current, measured in miles per hour.
- Distance travelled downstream, measured in miles.
- Time spent on travelling, measured in hours.
Speed in still water occurs when current speed is zero. Then, such variable is obtained after subtracting current speed on both sides of the expression. Hence:

The speed is still water is
.
Answer:
0.726 is the probability that the project will be completed in 33 days or less.
Step-by-step explanation:
We are given the following information in the question:
Mean, μ = 30 days
Variance = 25 days
Standard Deviation,

We assume that the distribution of path length is a bell shaped distribution that is a normal distribution.
Formula:

P(completed in 33 days or less)
Calculation the value from standard normal z table, we have,

0.726 is the probability that the project will be completed in 33 days or less.
Answer:
Let's use these two sets given to explain what is the domain.
Each value from the left set is x, and from the right is f(x).
If we plug any x from the left set in the function, we'll get f(x) that corresponds to it and that's exactly what the arrows are showing.
Domain of the function is, basically, a set of all values x can have.
In this case, it's easy to see, those are all members of the left set (-6, 1, 5, 8), but sometimes this set can have lots and lots of members, even infinity.