Answer: Yes
Step-by-step explanation:
Hi, to answer this question we have to add Brett's and Irwin's meters of fabric and compare:
1 3/4 + 3/2 = (4(1)+3)/4 + 3/2 = 7/4 + 3/2 = 7/4 + 3(2)/2(2) = 7/4 +6/4 =13/4
m
Total meters of fabric available = 23/6m = 3.25m (in decimal form)
Meters of fabric needed = 2 1/2 = 5/2 = 2.5 m
Since the meters available are greater than the meters needed:
3.25> 2.5
They have enough fabric.
4x^2+23x-72=
4x(x+8)-9(x+8)=
i got dis 4 yo answer and it is (x+8)(4x-9)
hope dis helped
<span>X+2a = 16+aX-6a
8X - 16 = aX-2a
8(X-2) = a(X-2)
</span><span>(X-2)/<span>(X-2)</span> = a/8
1 = a/8
a= 8
</span>