(a) MAE = 5.20
(b) MSE = 10
(c) MAPE = 38.60%
(d) Forecast for week 7 = 14
Step-by-step explanation:
Note: See the attached excel for the calculations of the Error, Error^2, and Error %.
(a) mean absolute error
MAE = Total of absolute value of error / Number of observations considered = |Error| / 5 = 26 / 5 = 5.20
(b) mean squared error
MSE = Total of Error^2 / Number of observations considered = Error^2 / 5 = 150 / 5 = 10
(c) mean absolute percentage error (Round your answer to two decimal places.)
MAPE = Total of Error % / Number of observations considered = Error % / 5 = 193.02 / 5 = 38.60%
(d) What is the forecast for week 7?
Since the forecast is based on the naive method (most recent value), the forecast for week 7 is value for week 6. Therefore, we have:
Forecast for week 7 = 14
421.75
2
_____
843.50
+
15.25
4
____
61.00
843.50
+ 61.00
_______
904.50
Answer:
1st One goes to the third one
2nd one goes to the 1st one
3rd one goes to the 4th one
and the 4th one goes to the 2nd one
This question is incomplete
Complete Question
Consider greenhouse A with floor dimensions w = 16 feet , l = 18 feet.
A concrete slab 4 inches deep will be poured for the floor of greenhouse A. How many cubic feet of concrete are needed for the floor?
Answer:
96 cubic feet
Step-by-step explanation:
The volume of the floor of the green house = Length × Width × Height
We convert the dimensions in feet to inches
1 foot = 12 inches
For width
1 foot = 12 inches
16 feet = x
Cross Multiply
x = 16 × 12 inches
x = 192 inches
For length
1 foot = 12 inches
18 feet = x
Cross Multiply
x = 18 × 12 inches
x = 216 inches
The height or depth = 4 inches deep
Hence,
Volume = 192 inches × 216 inches × 4 inches
= 165888 cubic inches
From cubic inches to cubic feet
1 cubic inches = 0.000578704 cubic foot
165888 cubic inches = x
Cross Multiply
x = 16588 × 0.000578704 cubic foot
x = 96 cubic feet
Therefore, 96 cubic feet of concrete is needed for the floor