8.2 is the correct answer
Answer:
h(f(x))=3x-4
Step-by-step explanation:
You combine both F(X) and H(x).
f(x)=x-7 , therefore it is f(x)=1x-7
You add 2x with 1x to get 3x
and 7-3 is -4.
h(f(x))=3x-4
the answer is in this picture.
So 3/5 of the total bill was for labor....and labor costs are 79.50...
so 3/5b = 79.50
3/5b = 79.50
b = (79.50) / (3/5)
b = 79.50 * 5/3
b = 397.50/3
b = 132.50 <=== total bill