Answer:
About 1,800 accidents
Step-by-step explanation:
Observing the attached figure
In 1965 ----> Approximately 260 accidents
In 1966 ----> Approximately 325 accidents
In 1967 ----> Approximately 300 accidents
In 1968 ----> Approximately 350 accidents
In 1969 ----> Approximately 360 accidents
In 1970 ----> Approximately 400 accidents
<em>Total------> Approximately 1.920 accidents</em>
Answer:it will cost $1698
Step-by-step explanation:
You read online that a 15 ft by 20 ft brick patio would cost about $2,275 to have professionally installed. The area of the patio would be
15 × 20 = 300 square feet
It means that it costs $2275 to install 300 square feet of the patio professionally. Therefore, the cost of installing 1 square feet professionally would be
2275/300 = $7.58 per square feet
To estimate the cost of having a 14 by 16 ft, we would determine the total area.
Area = 16 × 14 = 224 square feet.
Therefore, the cost of installing 224 square feet professionally would be
224 × 7.58 = 1697.92
Approximately $1698
Answer:
A. 20t² + 9t - 20
Step-by-step explanation:
(5t × 4t) + (5t × 5) - (4 × 4t) - (4 × 5)
= 20t² + (25t - 16t) - 20
= <u>20t² + 9t - 20</u> (A)
<em>Hope </em><em>this </em><em>is </em><em>h</em><em>e</em><em>l</em><em>p</em><em>ful </em><em>and </em><em>useful </em><em>:</em><em>)</em>
Pretty sure it’s 16TXI, hope this helps!
Slope= (y2-y1)/(x2-X1)
1=(9-3)/(3-x)
1=6/(3-x)
3-x=6
X=9