Answer:b.activity-based costing.
Step-by-step explanation: Activity-based costing is a costing system that first talkies or identifies the activities that are involved in the Manufacturing or in a particular process and them assigns cost to such activities. This type of costing gives high premium or focus on the activities as it assigns cost to products based on the activities that led to the production of the products.
THIS TYPE OF COSTING IS ALSO KNOWN AS ABC APPROACH TO COSTING IT FIRST ASSIGN RESOURCES TO ACTIVITIES AND FROM ACTIVITIES TO PRODUCTS BASED ON THE CONSUMPTION ESTIMATES.
Make a drawing with a right triangle.
The opposite side, y, is the height of the dam less 1.65 m
The base or adjacent side is 90 m
The angle between the two sides is 90 m.
Then tan (26) = y / 90
y = 90 tan(26) = 90 (0.4877) = 43.90 m
The height of the dam is 43.90m + 1.65m = 45.55 m
Answer:

Step-by-step explanation:
To find:
The value of
= ?
Solution:
Kindly consider the equilateral
as attached in the answer area.
Let the side of triangle =
units
Let us draw the perpendicular from vertex A to side BC.
It will divide the side BC in two equal parts.
i.e. BD = DC = 
Using Pythagorean Theorem in
:

Side AD = 
Using Trigonometric ratio:


Putting the values of AD and BD:

If this represents 15 percent of the total number of photos taken, which equation can be used to find the total number of photos? A. 60×4/15×4 = 240/60.
Answer:
Required largest volume is 0.407114 unit.
Step-by-step explanation:
Given surface area of a right circular cone of radious r and height h is,
and volume,

To find the largest volume if the surface area is S=8 (say), then applying Lagranges multipliers,
subject to,

We know for maximum volume
. So let
be the Lagranges multipliers be such that,



And,



Substitute (3) in (2) we get,



Substitute this value in (1) we get,



Then,

Hence largest volume,
