Answer:
You get an perpendicular line through given point.
Step-by-step explanation:
In this method of drawing perpendicular line through given point,
you will draw an arc from given point R, so as to cut given line at A and B.
now ,length RA will be equal to length RB (radius of circle)
now, with length RA you will place compass at A and B to cut the arcs at point P (let) on other side of given line.Now, join PA and PB.
The closed RAPB makes a rhombus and diagonal bisect perpendicularly in rhombus.
so you get an perpendicular line through given point.
For every 1/4 metric ton it takes 1/8 hours
then multipling by 8 to make the hours =1
for every 2 metric tons it take 1 hour
so the quotient is 2 metric tons per 1 hour
Answer:
1/10 is the simplest form
33+27=60. 9/60= .15 there's not much more to say.
She was at 40 feet below, she swam up getting so she was then at 40-10 = 30 feet below sea level.
She the swan 4 feet down so she ended up at 30 + 4 = 34 feet below sea level.
The answer is 34 feet below sea level (-34)