Answer:
She can use a calculator
Step-by-step explanation:
Answer:
x=4
Step-by-step explanation:
Let's solve the equation:
3x+12=4x+8
12=4x-3x+8
12=x+8
12-8=x
4=x
x=4
The way i got this answer was by solving the equation using the following steps. Since you're solving for one side and have two different equations, put an equal sign in between the two equations to get the equation set up above. Then you need to have the x variable on one side, instead of both sides, so you take 3x and subtract it from both sides, leaving x on one side, because 4x-3x is equal to 1x, or just x. Then we need to have what is not attached to a variable on the other side to make it easier to solve, so you would need to subtract 8 from both sides to get rid of the 8 on the side with the variable, because if you subtract 12 from both sides, it will just make it more confusing to solve, and then 12-8 is equal to 4, so you get x is equal to 4.
Answer:
The best point of estimate for the true mean is:

Since the time can't be negative a good approximation for the confidence interval would be (0,5.248) minutes. The interval are tellling to us that at 95% of confidence the average late time is lower than 5.248 minutes.
Step-by-step explanation:
Information given
represent the sample mean for the late time for a flight
population mean
represent the population deviation
n=76 represent the sample size
Confidence interval
The best point of estimate for the true mean is:

The confidence interval for the true mean is given by:
(1)
The Confidence level given is 0.95 or 95%, th significance would be
and
. If we look in the normal distribution a quantile that accumulates 0.025 of the area on each tail we got
Replacing we got:
Since the time can't be negative a good approximation for the confidence interval would be (0,5.248) minutes. The interval are tellling to us that at 95% of confidence the average late time is lower than 5.248 minutes.
4 pound of oats twice a day= 8 pounds of oats each day per horse. He has 4 horses so 4 horses times 8 pounds of oats is 32. You multiply 32 pounds times the three days he has to feed which is 96 pounds.
Answer: The number of cubic yards of concrete that are needed is 720.
Step-by-step explanation: The same formula for this type of shape stays the same: l*w*(h or d).
240 * 4 = 960
960 * 0.75 = 720