Answer:
32
Step-by-step explanation:
math
................
Answer: It would take 9 hours for 4 painters to paint 720 feet of fence.
Step-by-step explanation:
1.) Calculate the time needed to paint the 720 ft fence with 2 painters.
a.) Divide 720 by 280 to get how many times greater 720 is than 280.
720 / 280 ≈ 2.57
b.) Multiply the time needed to paint the 280 ft fence with 2 painters by 2.57.
7 * 2.57 ≈ 18
2.) Calculate the time needed to paint the 720 ft fence with 4 painters.
a.) Assuming that each painter paints the same amount of fence, divide the time in half, as 4 painters is double the original amount, so it would take half of the time.
18 / 2 = 9
Answer:As Joanne friend I'll say to Joanne (to convince her that she should not give up)that I'll lend her money or we can borrow money from the bank.
Point-slope form: we need a point (x₀,y₀) and the slope "m".
y-y₀=m(x-x₀)
Data:
(1,1)
m=2
Therefore:
y-y₀=m(x-x₀)
y-1=2(x-1) This is the equation of the line in point-slope form.
Answer. y-1=2(x-1)
2825/1250 = 2.26
2.26 is the answer i think