
84% of a contractor’s jobs involves electrical work. 75% of a contractor’s jobs involve plumbing work. Of the jobs that involve plumbing, 90% of the jobs also involves electrical work. Let E = jobs involving electrical work L = jobs involving plumbing work Suppose one of the contractor’s jobs is randomly selected. Using the sixth Excel worksheet, a) Find P(E). 0.84 b) Find P(L). 0.75 c) In words, what does E | L mean? d) Find P(E | L). e) Find P(E and L). f) Are E and L independent events? Why or why not? g) Find P(E or L).
Answer:
0.5 hour
Step-by-step explanation:
Given
Speed of Dina = 10 km/h
Distance = 20 km
So the time Dina taken to complete the track is:

The time taken by Dina is 2 hours. As masha started with dina but she was 4 km of the path left to cycle,
her distance covered in 2 hours was:

So we know the time and distance:
Now,

We have to calculate the time that will be needed by MAsha to complete the track:
As we know the speed and remaining distance

Masha needs 0.5 hour to complete the track ..
Answer:
25 and there a leftpover of 2
Step-by-step explanation:
Simply add the two dosages together, (0.15+0.025) and the answer is 0.175 :)
Answer:
61.25%
Step-by-step explanation:
How many ml of 20 percent acid should be added to pure acid
to make 70 ml of 30 percent acid?
:
let x = amt of 20% mixture
then
(70-x) = amt of pure acid
:
0.20x + (70-x) =0 .30(70)
0.20x + 70 - x = 21
= 21 - 70
-0.8x =-49
x = 61.25%
x = +61.25 ml of 20% stuff