Answer: Matched pairs design
Explanation:
A matched pairs design is a type of study used when 2 treaments are present in an experiment. The individuals in the design can be divided into pairs using a blocking variable, and each pair can then be allocated to treatments at random. This is thus a special type of randomized block design.
In this case the blocking variable can be the various urban areas as 1968 is matched against 1972. Each city can be compared based on 2 measurements. From their each individual can be grouped into pairs and allocated to different treatments.
D) They pay for specific social programs rather than general government activities.
The variance analysis cycle<u> C. begins with the preparation of </u><u>performance reports</u><u>.</u>
<h3>What is a performance report?</h3>
A performance report is at the heart of the variance analysis cycle.
The performance report details the following:
- Calculates the difference between actual and budgeted expenditure and revenue.
- Analyzes the differences into various variances, determining if they are favorable or unfavorable or have no effects.
- Investigates the reasons for the differences.
- Puts the information together and reports to management.
Thus, the variance analysis cycle<u> C. begins with the preparation of </u><u>performance reports</u><u>.</u>
Learn more about performance reports and variances at brainly.com/question/13287252
Answer:
Motivation and enthusiasm. Your next employer is investing in you, so they need to see that you are enthusiastic about working and motivated in your career.
Explanation:
Answer:
D.
Explanation:
PERT and CPM are network planning techniques.
PERT means Program Evaluation and Review Technique.
CPM means Critical Path Method.
The six steps more common to PERT and CPM are:
-Define the project and identify each activity.
-Develop relationships among the activities.
-Draw the network connecting all of the activities.
-Adding time and/or cost estimates to each activity.
-Compute the longest time path through the network. This is called the critical path.
-Use the network to help plan, schedule, monitor and control the project.