Both are not equivlant to the top speed of the model plane because caculator op.
The time at which the cost for the services of the two companies would be in exactly 6 days. If we would compare the two charges, we would see that company A just charges 40 per day while B has a charge of 60, which is a standard fee, and a rate of 30 per day. So if we compute 40 x 6, we will have a total cost now of 240. If we compute 30 x 6, we will have a total cost now of 180 plus 60 which is the standard fee, and we will get 240. So in 6 days, the rates of the two companies would both accumulate to 240.
we can insert > to make the following sentence true that is
> 4
we have to solve the following sentence
--- 4 ( insert <,>, = to make the following sentence true)
what is square root ?
The square root of a number is the factor that we can multiply by itself to get that number. The symbol for square root is
.
we know that
square root of 17 is 4.12310563
which is 4+ 0.12310563
that is if we add 4+0.12310563 we get 4.12310563
therefore square root of 17 is greater than 4
that is
> 4
since 4.12310563 > 4
hence, we can insert > to make the following sentence true that is
> 4
learn more about of square root here
brainly.com/question/1387049
#SPJ4
Hello :
let : A(0,3) B(4,8)
<span>the slope is : (YB - YA)/(XB -XA)
</span>(8-3)/(4-0) = 5/4
same method for 4
Answer:
482.5 ft^2.
Step-by-step explanation:
The figure can be regarded as a rectangle with a triangle cut out of one corner.
The base of the triangle = 25-20 = 5 in and the height = 20 - 13 = 7 in.
The required area = area of rectangle - area of triangle
= 25*20 - 1/2 * 5 * 7
= 500 - 17.5
= 482.5 ft^2