Answer:
y=2x-4
I think this is right
Step-by-step explanation:
Answer:
p(on schedule) ≈ 0.7755
Step-by-step explanation:
A suitable probability calculator can show you this answer.
_____
The z-values corresponding to the build time limits are ...
z = (37.5 -45)/6.75 ≈ -1.1111
z = (54 -45)/6.75 ≈ 1.3333
You can look these up in a suitable CDF table and find the difference between the values you find. That will be about ...
0.90879 -0.13326 = 0.77553
The probability assembly will stay on schedule is about 78%.
Answer:
225 frogs
Step-by-step explanation:
Total population of frogs = 300 frogs.
Observed population of frogs = 24
6 of the 24 observed frogs had spots
Which means , the number of frogs that did not have spots = 24 - 6 = 18 frogs.
We were told to find how many of the total population can be predicted to NOT have spots. We would form a proportion.
If 24 frogs = 18 frogs with no spots
300 frogs = Y
Cross multiply
24Y = 300 × 18
Y = (300 × 18) ÷ 24
Y = 5400 ÷ 24
Y = 225 frogs.
This means out of 300 frogs, 225 frogs do not have spots.
Therefore, the total population that can be predicted to NOT have spots is 225 frogs.
the total population can be predicted to NOT have spots
f(x) = mx + b
m = slope = -5
f(2) = 10 = (-5)(2) + b
b = 10 + 10 = 20
Ans. m=-5, b = 20
Answer:
Dependent variable is the amount of hours of sleep.
Independent variables are gender, amount of time spent studying, and hours of activity.