Answer:
Construction documents, as defined by CSI, are "the written and graphic documents prepared for communicating the project design for construction and administering the construction contract." They consist of the drawings, specifications, contracting requirements, procurement requirements, modifications and addenda.
Answer:
a) 358.8 KJ/kg
b) 0.0977 KJ/K- kg
c) 83.28%
Explanation:
N2 at 300 k. ( use the properties of N2 at 300 k (T1) )
Cp = 1.04 KJ/kg-k , Cv = 0.743 KJ/Kgk , R = 0.1297 KJ/kgk , y = 1.4 ,
Given data:
T2 = 645 k
P1 = 1 bar , P2 = 10.5 bar
<u>a)Determine the work input in KJ/Kg of N2 flowing </u>
Winput = h2 - h1 = Cp( T2 - T1 ) = 1.04 ( 645 - 300 ) = 358.8 KJ/kg
<u>b) Determine the rate of entropy in KJ/K- kg of N2 flowing </u>
Rate of entropy ( Δs ) = Cp*InT2/T1 - R*In P2/P1
= 1.04 * In (645/300) - 0.1297 * In ( 10.5 / 1 )
= 0.0977 KJ/K- kg
<u>c) Determine isentropic compressor efficiency </u>
Isentropic compressor efficiency = 83.28%
calculated using the relation below
( h'2 - h1 ) / ( h2 - h1 ) = ( T'2 - T1 ) / ( T2 - T1 )
where T'2 = 587.314
Answer:
Explanation:
The detailed analysis, with free body diagram and step by step calculations with appropriate substitution is as shown in the attached files.
Answer:
I have 72 baes just kidding I have 73 but they all don't love me