Answer:
23 days
Step-by-step explanation:
We are told that the stadium holds 7500 individuals.
Now, if 600 seats have already been made, It means the number of seats left to be made to complete the stadium = 7500 - 600 = 6900 seats
We are told that 300 seats can be made in a day. Thus, number of days to be used to finish the remaining seats = 6900/300 = 23 days
Thus, it will take 23 days to complete all the 7500 seats.
46% is equal to 14/25
14/25 is equal to 46/100 (multiply 14/25 times 4/4) and that is 46%
Answer:
around 917
Step-by-step explanation:
Answer:
4 feet of wall should be on each side of the painting.
Step-by-step explanation:
Given that a 4 foot wide painting should be centered on a 12 foot wide wall, to determine how many feet (X) should be on each side of the painting, the following equation must be solved:
(Total wide of the wall - wide of the painting) / 2 = X
(12 - 4) / 2 = X
8/2 = X
4 = X
Therefore, 4 feet of wall should be on each side of the painting.