I think (A.) if not im so sorry
Good luck
Answer:
0.726 is the probability that the project will be completed in 33 days or less.
Step-by-step explanation:
We are given the following information in the question:
Mean, μ = 30 days
Variance = 25 days
Standard Deviation,

We assume that the distribution of path length is a bell shaped distribution that is a normal distribution.
Formula:

P(completed in 33 days or less)
Calculation the value from standard normal z table, we have,

0.726 is the probability that the project will be completed in 33 days or less.
Answer:
Option A.
Step-by-step explanation:
According to triangle inequality theorem, a triangle exists if the sum of two sides is greater that third side.
Apply this theorem on each combination.
Case I:
...(1)
Case II:
...(2)
Case III:
...(3)
On combining (1), (2) and (3), we get
Therefore, the correct option is A.
Longitud = L Ancho = A
2A + 2L = 54
L = 2A Sustituir este valor por L en la primera ecuación:
2A + 2(2A) = 54
2A + 4A = 54
6A = 54
A = 9
También porque L = 2A,
L = 2(9) = 18
Answer:
If your answer is multiple choice, try to look for a graph that matches these intercepts. I hope this helped you. Have a great rest of your day!