1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Rainbow [258]
3 years ago
8

I. Work out the following Questions clearly and neatly

Mathematics
1 answer:
xxMikexx [17]3 years ago
5 0

Answer:

the rent and I have a great day of school and I have a great day of school and I have a great day of school and I have a great day of school and I have a great day of school and I have a great day of school

You might be interested in
What is least to greatest 0.65,2/3,-0.6 or -4/5 ?​
pav-90 [236]

Answer: -4/5, -0.6, 0.65, 2/3

Step-by-step explanation:

turn the fraction's into decimal's by dividing the numerator by denominator then just order then from least to greatest and dont forget to put then in their original form when done.

5 0
3 years ago
75%
REY [17]

Answer: 45/

Step-by-step explanation:

8 0
2 years ago
A 10 meter ladder was placed on an angle. The base of the ladder is 5 meters away from the
Olenka [21]

Answer:

5^2 + h^2 = 10^2

Step-by-step explanation:

This is a clear example of the Pythagorean Theorem, a relation of all sides in a right triangle. The equation itself is a^2 + b^2 = c^2. By simply plugging in the given values into the triangle, you would get the answer.

4 0
3 years ago
Read 2 more answers
Labor productivity is normally measured by Part 2 A. the educational level of workers. B. the change in the amount of leisure. C
Anettt [7]

Labor productivity is normally measured by (c) <u>dividing total real domestic output by the number of workers or by the number of</u><u> labor hours.</u>

<u />

<h3>What is Labour productivity?</h3>
  • The total volume of production (measured in terms of Gross Domestic Product, GDP) produced per unit of labor (measured in terms of the number of employed workers or hours worked) during the course of a specific time reference period is what is referred to as labor productivity.
  • Divide the total output by the total labor hours to find the labor productivity of a nation.

What is labour productivity in India?

  • A measurement of labor output is labor productivity.
  • Hourly productivity metrics are used. The actual Gross Domestic Product (GDP) produced by labor in an hour is what is referred to as labor productivity in macroeconomics.
  • An important component of a business's overall growth is labor productivity.

Learn more about labour productivity

brainly.com/question/16690539

#SPJ4

5 0
2 years ago
Find the measure of one interior angle in each regular polygon. round your answer to the nearest 10th if necessary.
dem82 [27]

Answer:

140 degree or Answer D

Step-by-step explanation:

140 degrees is the answer for a Nonagon

8 0
2 years ago
Other questions:
  • Type in the number that should go in the blank. Use a slash (/) to show a fraction.
    7·1 answer
  • Karen earned $33 in 4 hours at her job today. She wants to know how much she could earn tomorrow if she works 10 hours at the sa
    11·2 answers
  • What is the solution to 8-2b = -2/3(12b+6)
    7·1 answer
  • The temperature outside dropped 13 degrees Fahrenheit in 7 hours. The final temperature was -2 degrees Fahrenheit. What was the
    12·1 answer
  • I also need help with this tri trig I think the answer is 20.73 but there’s no answer for it and says to round to nearest 10th
    15·1 answer
  • The school bleachers measure 25 feet from the floor diagonally to the top seat. They extend 20 feet from the back wall.
    7·1 answer
  • Create an equation that has a solution of x=4)
    11·1 answer
  • How do I solve this problem?
    6·1 answer
  • I NEED HELP ASAP! HELP
    8·1 answer
  • Dueling Discounts Information:
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!