Answer:
Answer below :)
Explanation:
<u>SIZE OF THEODOLITE:</u> A theodolite is designated by diameter of the graduated circle on the lower plate. The common sizes are 8 cm to 12 cm while<em> 14 cm</em> to <em>25 cm</em> instrument are used for triangulation work.
Answer:
125 cm³/min
Explanation:
The material rate of removal is usually given by the formula
Material Rate of Removal = Radial Depth of Cut * Axial Depth of Cut * Feed Rate, where
Radial Depth of Cut = 25 mm
Axial depth of cut = 200 mm
Feed rate = 25 mm/min
On multiplying all together, we will then have
MRR = 25 mm * 200 mm * 25 mm/min
MRR = 125000 mm³/min
Or we convert it to cm³/min and have
MRR = 125000 mm³/min ÷ 1000
MRR = 125 cm³/min
Answer:
P = 4.745 kips
Explanation:
Given
ΔL = 0.01 in
E = 29000 KSI
D = 1/2 in
LAB = LAC = L = 12 in
We get the area as follows
A = π*D²/4 = π*(1/2 in)²/4 = (π/16) in²
Then we use the formula
ΔL = P*L/(A*E)
For AB:
ΔL(AB) = PAB*L/(A*E) = PAB*12 in/((π/16) in²*29*10⁶ PSI)
⇒ ΔL(AB) = (2.107*10⁻⁶ in/lbf)*PAB
For AC:
ΔL(AC) = PAC*L/(A*E) = PAC*12 in/((π/16) in²*29*10⁶ PSI)
⇒ ΔL(AC) = (2.107*10⁻⁶ in/lbf)*PAC
Now, we use the condition
ΔL = ΔL(AB)ₓ + ΔL(AC)ₓ = ΔL(AB)*Cos 30° + ΔL(AC)*Cos 30° = 0.01 in
⇒ ΔL = (2.107*10⁻⁶ in/lbf)*PAB*Cos 30°+(2.107*10⁻⁶ in/lbf)*PAC*Cos 30°= 0.01 in
Knowing that PAB*Cos 30°+PAC*Cos 30° = P
we have
(2.107*10⁻⁶ in/lbf)*P = 0.01 in
⇒ P = 4745.11 lb = 4.745 kips
The pic shown can help to understand the question.
Answer:
2102.1 m
Explanation:
Temperature at the equator = 0⁰
Radius of the earth = 6.37x10⁶
Required:
We how to find out what the clearance between tape and ground would be if temperature increases to 30 degrees.
Final temperature = ∆T = 303-273 = 30
S = 11x10^-6
The clearance R = Ro*S*∆T
=6.37x10⁶x 11x10^-6x30
= 2102.1m
Or 2.102 kilometers
Thank you