Your answer is b hope this helps
Answer:
60 and 25
Step-by-step explanation:
The range is the difference between the maximum value and the minimum value.
maximum value = 125, minimum value = 65
range = 125 - 65 = 60
------------------------------------------
The interquartile range is the difference between the upper quartile Q₃ and the lower quartile Q₁
Q₃ is the value at the right side of the box = 115
Q₁ is the value at the left side of the box = 90
interquartile range = 115 - 90 = 25
Answer:
9.6 ft
Step-by-step explanation:
133.1 - (9.7 + 8.9 + 8.9 + 8.9 + 18.6 + 11.6 + 20.5 + 27.5 + 8.9)
133.1 - 123.5
= 9.6
Answer:
1. Quadrant 2
2. Quadrant 3
Step-by-step explanation:
The quadrants are ordered in a 'c' pattern. The first quadrant has coordinates (x,y). The second quadrant has coordinates (-x,y). The third quadrant has coordinates (-x,-y). The fourth quadrant has coordinates (x,-y).