sergejj [24]
3 years ago
6

The board of directors of a company knows that the probability that the carbon emission from the company’s manufacturing unit is

exceeding the permissible level is 35%. A consultant is hired to use a carbon footprint calculator to test for the emission level. The accuracy of this test is said to be 85%.
What is the probability that the carbon emission from the manufacturing unit is within the permissible level, and the test predicts the same outcome?

A.) 0.2975
B.) 0.0525
C.) 0.0975
D.) 0.5525
E.) 0.6325
Mathematics
2 answers:
enyata [817]3 years ago
6 0

the company's production unit has a risk of carbon emission

the probability that the company is exceeding the permissible level is 35% =0.35

so there can only be two possibilities, either the company is exceeding the permissible level or its within the permissible level.

and the accuracy of the test that tests the emission level is 85%


so the probability that the carbon emission is within the permissible level is

1 - 0.35 = 0.65

probability that the test measures this accurately is 0.85

therefore when checking the probability that both events happen we have to multiply the 2 probabilities

the probability that carbon emission is within the permissible level and test predicts this outcome is - 0.65 x 0.85 = 0.5525


answer is D.0.5525

Aleonysh [2.5K]3 years ago
5 0
P(exceeding limit) = 0.35P(within limit)    = 1 - P(exceeding limit) = 0.65By conditional probability,P(within limit and test says within limit) = P(within limit) P(test says within limit | within limit) = P(within limit) (Accuracy) = (0.65)(0.85) = 0.5525<span>Therefore, D.


I hope my answer has come to your help. Thank you for posting your question here in Brainly.</span>
You might be interested in
Machine A can complete a certain job in x hours. Machine B can complete the same job in y hours. If A and B work together at the
scZoUnD [109]

Answer:

\frac{y}{x+y}

Step-by-step explanation:

The required answer is the rate at  which Machine A  works when the two machines are combined.

Note: the rate of doing work is express as

rate=\frac{1}{time taken} \\

Hence we can conclude that Machine A working rate is

machine A=\frac{1}{x} \\ and machine B working rate is

machine B=\frac{1}{y} \\

When the two machine works together, the effective working rate is

\frac{1}{x}+\frac{1}{y}\\\frac{xy}{x+y}\\

The fraction of the work that Machine B will not have complete because of Machine A help is the total work done by machine A

Hence the fraction of work done by A is expressed as

\frac{1}{x}*combine working rate

\frac{1}{x}*\frac{xy}{x+y}\\\frac{y}{x+y} \\

Hence the fraction of the work that Machine B will not have complete because of Machine A help is the total work done by machine A is \frac{y}{x+y} \\

6 0
3 years ago
HELP ASAP TEST IS OMOST OVER!!!!!!!!!!
svet-max [94.6K]

Answer: C)46 ft

Step-by-step explanation:

We know that the circumference of a circle can be calculated with this formula:

C=2\pi r

Where "r" is the radius of the circle.

Since John is putting a fence around his garden that is shaped like a half circle and a rectangle, then we can find how much fencing he needs by making this addition:

Fencing=\frac{2\pi r}{2}+2l+w

Where "l" is the lenght of the rectangle and "w" is the width of the rectangle.

Since we know that the radius of the circle is half its diameter, we can find "r". This is:

r=\frac{7ft}{2}=3.5ft

Then, substituting values (and using \pi=\frac{22}{7}), we get:

Fencing=\frac{2(\frac{22}{7})(3.5ft)}{2}+2(14ft)+7ft=46ft

4 0
3 years ago
Read 2 more answers
PLEASE HELP!!!!!!!!!!!!CORRECT ANSWER WILL GET BRAINLIST
nadezda [96]

Answer: 2.4 degrees F

Step-by-step explanation:

4 0
3 years ago
Read 2 more answers
Is y=-2/5x inverse or direct variation
liraira [26]

Answer:

direct

Step-by-step explanation:

The standard form of an equation representing direct variation is

y = kx ← k is the constant of variation

The standard form of an equation representing inverse variation is

y = \frac{k}{x} ← k is the constant of variation

y = - \frac{2}{5} x ← represents direct variation with k = - \frac{2}{5}

3 0
3 years ago
How do I find this answer (all three of them)?
Korvikt [17]
1. 50 degrees
2. 130 degrees
3. 50 degrees
4 0
3 years ago
Read 2 more answers
Other questions:
  • An open rectangular box having a volume of 108 in.3 is to be constructed from a tin sheet. Find the dimensions of such a box if
    8·1 answer
  • Write the equation of the line that passes through (7,6) and (-1,2) in slope intercept form​
    8·1 answer
  • IM GIVING BRAINLIEST AND 100 POINTS NO JOKE. PLEASE HELP
    5·2 answers
  • What in the world is eighty plus forty
    8·1 answer
  • For the triangle shown, three possible lengths of x, y, and z are given. Find the measurements for the other two sides in
    7·1 answer
  • A gallon of milk weighs eight pounds, so you wouldn't try to carry three or four gallons home on your bicycle. gasoline is a bit
    8·1 answer
  • Justine estimated that she would drive 24 miles to get to the beach. It is a good thing she had plenty of gas because she got lo
    15·1 answer
  • The coach of the middle school track team collects data on the long jump. He records the length of the best jump in inches for e
    12·2 answers
  • Which expression represents the phrase ""the product of x and the quantity ‘10 minus x’""?
    15·1 answer
  • Is 3 tenths x 100 = 30 hundredths
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!