In physics, work is equal to the product of force and distance, given that the direction of force is the same with the direction of the distance.
W = Fd
The total force is
F = 1,700 N + 500 N = 2,200 N
Now, if the question is the work needed to lift the barbell from the ground, the distance would be 2 m. Hence, the work would be
W = (2,220 N)(2 m) = 4,400 N·m or 4,400 J
Answer:
1. x = -4y ---> y = (-1/4)x
slope = -1/4. y-intercept = (0,0)
2. y = -2x + 4
3. y = (1/3)x - 1
Step-by-step explanation:
1. Re-write your equation so that x is on the right and y is on the left:
x = -4y ---> y = (-1/4)x
slope = -1/4. y-intercept = (0,0)
2. y-intercept = (0,4) ----> P1
x-intercrpt = (2,0) ----> P2
slope m = (y2 - y1) / (x2 - x1)
= (0 - 4)/(2 - 0)
= -2
therefore, y - y1 = mx - x1 ---> y - 4 = -2x
or y = -2x + 4
3. y-intercept = (0,-1)
x-intercept = (3,0)
m = (0 - (-1)) / (3 -0) = 1/3
y - (-1) = (1/3)x - 0 ---> y = (1/3)x - 1
The 3rd graph should be it
The formula of a slope m:

We have the points (0, -1) and (5, -2). Substitute:

<h3>Answer: The slope = -1/5</h3>
80, 50 times 9.90 is 495 and 80 times 5.30 is 424, 424 + 495 = 919