Using the normal distribution, it is found that there was a 0.9579 = 95.79% probability of a month having a PCE between $575 and $790.
<h3>Normal Probability Distribution</h3>
The z-score of a measure X of a normally distributed variable with mean
and standard deviation
is given by:

- The z-score measures how many standard deviations the measure is above or below the mean.
- Looking at the z-score table, the p-value associated with this z-score is found, which is the percentile of X.
The mean and the standard deviation are given, respectively, by:
.
The probability of a month having a PCE between $575 and $790 is the <u>p-value of Z when X = 790 subtracted by the p-value of Z when X = 575</u>, hence:
X = 790:


Z = 1.8
Z = 1.8 has a p-value of 0.9641.
X = 575:


Z = -2.5
Z = -2.5 has a p-value of 0.0062.
0.9641 - 0.0062 = 0.9579.
0.9579 = 95.79% probability of a month having a PCE between $575 and $790.
More can be learned about the normal distribution at brainly.com/question/4079902
#SPJ1
If you divide 8 by 4, it comes to 2
If you divide 12 by 2, it comes to 3
That fraction is 2/3
The Fraction 10/15 is equal to 2/3 because...
If you divide 10 by 5, it comes to 2
If you divide 15 by 5, it comes to 3
Answer:
Length is 22.5 ft
Width is 16.5 ft
Step-by-step explanation:
4L-w=73.5
4L=73.5+w
L=(73.5+w)/4
P=78
P=2L+2w
78=2[(73.5+w)/4]+2w
78=(73.5+w)/2+2w
78=(73.5+w+4w)/2
2•78=73.5+5w
156=73.5+5w
156-73.5=5w
82.5=5w
82.5/5=w
16.5=w
L=(73.5+w)/4
=(73.5+16.5)/4
=90/4
L=22.5
Answer:
step 5
Step-by-step explanation: