Answer:
7.2 feet
Step-by-step explanation:
plug in x = 3 since we are looking for the height after the 3rd bounce
4(0.6)(3)
4(1.8)
7.2
No it is not a prime number
We know that
<span>Since the focus and vertex are above and below each other, rather than side by side, I know that this ellipse must be taller than it is wide.
</span>Then
a²<span> will go with the </span>y<span> part of the equation
</span>Also, since the focus is 8 <span>units below the center, then </span><span>c = 8
</span>since the vertex is 17<span> units above, then </span><span>a = 17
</span>The equation b²<span> = a</span>²<span> – c</span>²<span> gives me
</span>b²=17²-8²-----> b²=225
the equation is
y²/a²+x²/b²=1------> y²/289+x²/225=1
the answer isy²/289+x²/225=1see the attached figure
<h3>
Answer: -10 and -40</h3>
===============================================================
Explanation:
a = 200 = first term
d = -30 = common difference
Tn = nth term
Tn = a + d(n-1)
Tn = 200 + (-30)(n-1)
Tn = 200 - 30n + 30
Tn = -30n + 230
Set Tn less than 0 and isolate n
Tn < 0
-30n + 230 < 0
230 < 30n
30n > 230
n > 230/30
n > 7.667 approximately
Rounding up to the nearest whole number gets us 
So Tn starts to turn negative when n = 8
We can see that,
Tn = -30n + 230
T7 = -30*7 + 230
T7 = 20
and
Tn = -30n + 230
T8 = -30*8 + 230
T8 = -10 is the 8th term
and lastly
Tn = -30n + 230
T9 = -30*9 + 230
T9 = -40 is the ninth term
Or once you determine that T7 = 20, you subtract 30 from it to get 20-30 = -10 which is the value of T8. Then T9 = -40 because -10-30 = -40.
Answer:
The critical value is T = 1.895.
The 90% confidence interval for the mean repair cost for the washers is between $48.159 and $72.761
Step-by-step explanation:
We have the standard deviation for the sample, so we use the t-distribution.
The first step to solve this problem is finding how many degrees of freedom, we have. This is the sample size subtracted by 1. So
df = 8 - 1 = 6
90% confidence interval
Now, we have to find a value of T, which is found looking at the t table, with 6 degrees of freedom(y-axis) and a confidence level of
. So we have T = 1.895, which is the critical value.
The margin of error is:

In which s is the standard deviation of the sample and n is the size of the sample.
The lower end of the interval is the sample mean subtracted by M. So it is 60.46 - 12.301 = $48.159
The upper end of the interval is the sample mean added to M. So it is 60.46 + 12.301 = $72.761
The 90% confidence interval for the mean repair cost for the washers is between $48.159 and $72.761