1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
STatiana [176]
3 years ago
13

ABC software company is to develop software for effective counseling for allotment of engineering seats for students with high s

cores ranking from top colleges. The product has to be upgraded if the common entrance score is to be considered.
Describe the appropriate product development life cycle and the standard skills required.
Computers and Technology
1 answer:
Snowcat [4.5K]3 years ago
8 0

Answer:

A series of update steps must be done in the required software; for example:

Explanation:

Option 1: add the timestamp at the top of the view :

Open a workbook containing the dashboard in Tableau Desktop, then go to the sheet where you want to show the time of the last data update.

-Select Worksheet> Show Title.

-Double-click on the title.

-In the Edit Title dialog box, select Insert> Data update time, and then click OK.

-Add any field to the filter shelf, leave all other selections blank, and click OK.

-Save the changes.

-Add sheet to dashboard.

<u>Option 2: add the timestamp at the bottom of the view. </u>

Open a workbook containing the dashboard in Tableau Desktop, then go to the sheet where you want to show the time of the last data update.

-Select Worksheet> Show Caption.

-Double-click the subtitle.

-In the Edit Subtitle dialog box, select Insert> Data update time, and then click OK.

-Add any field to the filter shelf, leave all other selections blank, and click OK.

-Save the changes.

-Add the sheet to the dashboard.

-Right-click on the sheet and select Caption to display the update time.

You can modify the size of these sheets in the dashboard to take up the space you consider necessary. They can also be set as floating objects, so they don't alter the size of the rest of the sheets in the view.

You might be interested in
How do optical storage devices operate?
Firdavs [7]

In optical storage the data is encoded on the disk in the form of tiny pits that are arranged in the concentric rings.

so the answer should be

Optical storage devices focus a tiny pits in concentric tracks on a disk surface that acts as the storage medium.

I Hope it will help you.

7 0
3 years ago
A _____ network is where all computers are equal and each one is both data requester and data provider.
andre [41]

Answer:

peer-to-peer network

Explanation:

i think i'm not sure though so tell me if it is wrong :)

8 0
2 years ago
When creating any digital work, what is the MOST important thing to remember?
kvasek [131]

Answer:

ALWAYS  double check your work

Explanation:

3 0
3 years ago
The waterfall model and spiral model are variations of SDLC. Do some research to find out what they are and explain how these mo
Radda [10]

Waterfall model and spiral model are used in software development life cycle or SDLC. Any software development process follows one of these models depending on the type of software and the requirements of the customer.

Waterfall model

This model is called as sequential model since it works in stages. The output of first stage becomes the input of the second stage.

The errors of the first stage can be rectified only when it is completed. This is time consuming and makes the process lengthy. Stage 1 is completed before stage 2 begins.

The six stages involved in waterfall model are Requirement Gathering and analysis, System Design, Implementation, Integration and Testing, Deployment of system, and Maintenance.

Spiral model

This model is implemented in iterations. It is also called evolutionary model.  

Initially a prototype of the system is prepared. Then, it is followed by development of small parts of the system.

These smaller parts are then assembled to produce the final system.

The four stages which form the spiral model are Identification, Design, Development and Evaluation and Risk Analysis.

The differences between the two models are summarized below.

1. Waterfall model works in linear method. Spiral model follows evolutionary method.

2. Errors and risks are discovered/ rectified after the stage is over. Errors and risks are discovered/ rectified earlier.

3. Waterfall model is suitable for small projects. Spiral model is suitable for large projects.

4. Requirements identification and planning is the initial stage in the waterfall model. Requirements identification and planning is done when needed, in the spiral model.

5. Waterfall model allows little to no flexibility in the system. Spiral model allows flexibility in the system.

6. Low flexibility makes the waterfall model more risky. High flexibility makes the spiral model less risky.

7. Waterfall model, overall, takes less time since requirements are clear. Spiral model is implemented when the requirements of the system are not clear and become clear through prototypes.

8 0
3 years ago
Typically, you need to score _____ or higher on an AP exam to receive college credit for the AP course in the subject tested by
ss7ja [257]

the answer is A). 3 or higher

7 0
3 years ago
Read 2 more answers
Other questions:
  • Which type of JPEG image records the most information in the digital file? Medium Low Fine Expert
    6·2 answers
  • Consider the following class definitions. public class BClass { private int x; public void set(int a) { x = a; } public void pri
    11·1 answer
  • Which of these is a subdirectory? <br> HTTPS <br> /FAQ <br> .org <br> WWW
    15·1 answer
  • What are examples of some Exotic currencies?
    14·1 answer
  • (It science question)
    9·1 answer
  • .in the array based list implementation of the ADT what is the worst case time efficiency of the remove method?
    6·1 answer
  • Why bootable installer preparation is important? explain
    9·1 answer
  • What is the output?<br> &gt;&gt;&gt; phrase = "hello mom"<br> &gt;&gt;&gt; phrase upper()
    6·2 answers
  • ¿Qué aspectos de impacto medioambiental e impacto social tienen relación con la poca disminución de los residuos? Es para hoy.
    13·1 answer
  • Write a program that accepts a whole number as input, multiplies that number by 12, and then outputs the product.
    6·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!