Answer:
d. 15
Step-by-step explanation:
Putting the values in the shift 2 function
X1 + X2 ≥ 15
where x1= 13, and x2=2
13+12≥ 15
15≥ 15
At least 15 workers must be assigned to the shift 2.
The LP model questions require that the constraints are satisfied.
The constraint for the shift 2 is that the number of workers must be equal or greater than 15
This can be solved using other constraint functions e.g
Putting X4= 0 in
X1 + X4 ≥ 12
gives
X1 ≥ 12
Now Putting the value X1 ≥ 12 in shift 2 constraint
X1 + X2 ≥ 15
12+ 2≥ 15
14 ≥ 15
this does not satisfy the condition so this is wrong.
Now from
X2 + X3 ≥ 16
Putting X3= 14
X2 + 14 ≥ 16
gives
X2 ≥ 2
Putting these in the shift 2
X1 + X2 ≥ 15
13+2 ≥ 15
15 ≥ 15
Which gives the same result as above.
A) c + t = 60
B) 3c = 7t
Multiplying A) by -3
A) -3c + -3t = -180 then adding this to b
B) 3c = 7t
180 = 10t
trucks = 18
cars = 42
Answer: B) one
This one point is point U since it is on line segment CD. In contrast, a point like point E is not on line CD, so E is not collinear with C and D.
Answer:
C
Step-by-step explanation:
2 in this case is the weight and 34 is pounds