Answer:
c
Step-by-step explanation:
consider points (0,2) and (-4,0)
slope=(0-2)/(-4-0)=-2/-4=1/2
y-intercept=2
y=mx+c
y=1/2 x+2
We know that
Double number lines<span> are best used to visualize equivalent ratios and describe a ratio relationship between two quantities.
</span>
<span>start with the par 40% - 648 gal and let's calculate the other missing data
to find 10%-------> multiply 648 gal by (1/4)
</span>to find 20%-------> multiply 648 gal by (1/2)
to find 30%-------> multiply 648 gal by (3/4)
to find 50%-------> multiply 648 gal by (5/4)
to find 60%-------> multiply 648 gal by (6/4)
to find 70%-------> multiply 648 gal by (7/4)
to find 80%-------> multiply 648 gal by (8/4)
to find 90%-------> multiply 648 gal by (9/4)
to find 100%-------> multiply 648 gal by (10/4)<span>
</span>Here is what the numbers would look like on a number line. They are lined up.
10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
162 324 486 648 810 972 1134 1296 1458 1620
the answer is
the maximum capacity is 1620 gallons of water.
Answer:d
Step-by-step explanation:
Should be 4 games not 135
Square has 4 sides
20 mill for each side
we mutiply all four corners
=80 mill
Answer:
146.66 hours.
Step-by-step explanation:
Given: Height of snow at the beginning is 84 inches.
Snow melting rate is 0.15 inches per hour.
Now, finding number of hours to reach 62 inches of snow.
First lets find the number of inches reduced.
Reduced inches of snow= 
∴ Reduced inches of snow is 22 inches after melting at 0.15 inches per hour.
Next finding hours to melt 22 inches of snow.
Time= 
⇒ Time= 
Hence, 146.66 hours would it take for the snow to reach 62 inches.