1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Radda [10]
3 years ago
13

Graph y = 1/3x + 3. Can someone help me with this question ​

Mathematics
1 answer:
xxTIMURxx [149]3 years ago
8 0

Answer:

Points are (-9, 0 ) and (0, 3) then draw a line through both points.

Step-by-step explanation:

You might be interested in
7. how many tiles measuring
Margaret [11]

Answer:

245 tiles

Step-by-step explanation:

1 meter = 100 cm

Area of bathroom = 3.5m x 2.8m = 350x280 = 9800 cm²

Area of each tile = 20cm x 20cm = 400 cm²

Total number of tiles required = 9800/400 = 245

<u>Note</u>

Strictly speaking we have to find out how many tiles can be fitted in the length and breadth of the bathroom. Since the bathroom is 350 cm wide, we can fit 350/20cm = 17.5 tiles. However, there is no concept of 1/2 tile so the question has an ambiguity. along the width, we can fit 280/10 = 14 tiles

17.5 x 14 = 245 but if the question is reworded to how many tiles do we need to purchase to floor the bathroom it would be 18 x 14 = 252

5 0
2 years ago
4. A loan made on March 12 is due September 10 of the following year. Find the exact time for the loan in a non-leap year and a
saul85 [17]

Answer:

182 days

Step-by-step explanation:

Given:

Date on which loan is made = March 12

Due date of the loan = September 10

Now,

The months in between March and September and the number of days in the particular months are

Month                          Number of days

April                               30

May                                31

June                               30

July                                 31

August                            31

------------------------------------------

Total number of days =  153

also,

Number of days left in March after 12 are (31 - 12 ) = 19 days

and,

Number of days in September before the due date = 10 days

Hence, the total time for loan = 19 + 153 + 10 = 182 days

since the included months does not have the month of February. Therefore,

the time for both leap year and non-leap year will remain same.

7 0
4 years ago
Student A starts with $100 in the bank and makes $5 a day. Student B starts with $50 and makes $7 a day. Assuming the students s
nasty-shy [4]
Student A starts with $100 in the bank and makes $5 a day. Student B starts with $50 and makes $7 a day. Assuming the students save their money, when will they have the same amount of money ?
3 0
3 years ago
Read 2 more answers
A square rests inside a regular octagon. Each shape has a side length measuring 9 inches.
Phantasy [73]

Wait so are the sides of the octagon 9 inches each or do we have to find that?

6 0
3 years ago
Write the expression<br> a2b3c2d in expanded<br> form.
Zanzabum

Answer:

a*2+b*2+c*2+d

Step-by-step explanation:

If i's meant to be Pythagorean theorem, a*a+b*b=c*c

8 0
3 years ago
Other questions:
  • How do I do this and what is this shape called
    6·1 answer
  • What is the cost of a 12-in. by 12-in. book with 28 pages?
    6·1 answer
  • Two trains leave the same station at the same time, but are headed in opposite directions. One train travels at 70 mph and the o
    7·1 answer
  • Which of the following represent x=1/2y written in general form
    12·2 answers
  • Solving Systems with Substitution<br> x+y=-2<br> -4x+y=3
    8·1 answer
  • HELP HELP PLEASE DUE TONIGHT
    5·1 answer
  • Please help me on these
    5·1 answer
  • Help if you a real one! C”mon pls click on me!!
    15·1 answer
  • What specific measure of a geometric figure is shown in the image?
    12·2 answers
  • Which is the range of the discrete function G(x)?
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!