Answer:
f(x) = 4.35 +3.95·sin(πx/12)
Step-by-step explanation:
For problems of this sort, a sine function is used that is of the form ...
f(x) = A + Bsin(2πx/P)
where A is the average or middle value of the oscillation, B is the one-sided amplitude, P is the period in the same units as x.
It is rare that a tide function has a period (P) of 24 hours, but we'll use that value since the problem statement requires it. The value of A is the middle value of the oscillation, 4.35 ft in this problem. The value of B is the amplitude, given as 8.3 ft -4.35 ft = 3.95 ft. Putting these values into the form gives ...
f(x) = 4.35 + 3.95·sin(2πx/24)
The argument of the sine function can be simplified to πx/12, as in the Answer, above.
Answer:
0.91
Step-by-step explanation:
1 - P(both left handed)
1 - 0.3² = 0.91
Answer:
5.2
Step-by-step explanation:
add back 0.8 from 7 am temp which is 4.4 degrees.
let's firstly convert the mixed fractions to improper fractions and then divide.
![\bf \stackrel{mixed}{1\frac{1}{4}}\implies \cfrac{1\cdot 4+1}{4}\implies \stackrel{improper}{\cfrac{5}{4}}~\hfill \stackrel{mixed}{3\frac{4}{5}}\implies \cfrac{3\cdot 5+4}{5}\implies \stackrel{improper}{\cfrac{19}{5}} \\\\[-0.35em] ~\dotfill\\\\ \cfrac{5}{4}\div\cfrac{19}{5}\implies \cfrac{5}{4}\cdot \cfrac{5}{19}\implies \cfrac{25}{76}](https://tex.z-dn.net/?f=%5Cbf%20%5Cstackrel%7Bmixed%7D%7B1%5Cfrac%7B1%7D%7B4%7D%7D%5Cimplies%20%5Ccfrac%7B1%5Ccdot%204%2B1%7D%7B4%7D%5Cimplies%20%5Cstackrel%7Bimproper%7D%7B%5Ccfrac%7B5%7D%7B4%7D%7D~%5Chfill%20%5Cstackrel%7Bmixed%7D%7B3%5Cfrac%7B4%7D%7B5%7D%7D%5Cimplies%20%5Ccfrac%7B3%5Ccdot%205%2B4%7D%7B5%7D%5Cimplies%20%5Cstackrel%7Bimproper%7D%7B%5Ccfrac%7B19%7D%7B5%7D%7D%20%5C%5C%5C%5C%5B-0.35em%5D%20~%5Cdotfill%5C%5C%5C%5C%20%5Ccfrac%7B5%7D%7B4%7D%5Cdiv%5Ccfrac%7B19%7D%7B5%7D%5Cimplies%20%5Ccfrac%7B5%7D%7B4%7D%5Ccdot%20%5Ccfrac%7B5%7D%7B19%7D%5Cimplies%20%5Ccfrac%7B25%7D%7B76%7D)
The question is to find out how many times 1/4 is equal to 1 1/2
First lets convert the total:
1 1/2 = 2/2 + 1/2 = 3/2
now we need to find out a number that multiplied by 1/4 gives 3/2, that is an equation:
(1/4)x = 3/2
and solving for x:
x = (3/2)*4
x = 12/2
x = 6
therefore they will take 6 days to repave the whole street