Answer:
1 and 1/4 liters of paint are needed for one door
Step-by-step explanation:
You can eliminate each answer choice out. For '4/5 liters' you know that if that amount was used, it wouldn't be reasonable since it would mean that the more was used for the other 3/5 door. 3 and 1.5 would be too much since it is over 2 liters. 2 liters wouldn't be logical since you paint 1 <em>and</em> 3/5 of a door and you only used 2 liters, no more or no less, basically what would you use for the other 3/5 door if this was the answer.
Hope this helps!
The total amount Serena earns is the sum of her regular wage and the tips. The amount she earns from the wage is equal to 9h. This total should be more than or equal to $110. This is mathematically expressed as,
9h + 15 ≥ 110
Answer:
Yes, a minimum phase continuous time system is also minimum phase when converted into discrete time system using bilinear transformation.
Step-by-step explanation:
Bilinear Transform:
In digital signal processing, the bilinear transform is used to convert continuous time system into discrete time system representation.
Minimum-Phase:
We know that a system is considered to be minimum phase if the zeros are situated in the left half of the s-plane in continuous time system. In the same way, a system is minimum phase when its zeros are inside the unit circle of z-plane in discrete time system.
The bilinear transform is used to map the left half of the s-plane to the interior of the unit circle in the z-plane preserving the stability and minimum phase property of the system. Therefore, a minimum phase continuous time system is also minimum phase when converted into discrete time system using bilinear transformation.
35km; Since the points on the map are one millionth of their actual size, simply multiply by one million and convert from there.
35*1,000,000 = 35,000,000mm
35,000,000/1000 = 35,000m
35,000/1000 = 35km