Answer:
16 days
Step-by-step explanation:
108/9 is 12. The late fee is 12¢ per day. 16x12 is 192.
Answer:
Step-by-step explanation:
Needs $500 Makes 7.50 and works 10 hours week.
7.50*10= $75.00 a week
500/75= 6.6 weeks or 6 weeks and 2/3 of a week. I'd round to 7 weeks.
75(x)=500 X= weeks needed.
75x=500 if you divide 500 by 75
x=20/3 or 6.6
The answer should be $238 you multiply the daily cost by 4 and add that to the CDW to get the total cost.
BRAINLIEST
Answer:
6/3
Step-by-step explanation:
An integer is a whole number, that is not a fraction. All of the numbers are fractions, but if you simplify them, you see that 6/3=2. 2 is a whole number, and therefore an integer.