Answer:
-1
Step-by-step explanation:
We can use the slope formula when given two points
m= ( y2-y1)/(x2-x1)
= ( 3-7)/(2 - -2)
= (3-7)/( 2+2)
= -4/4
= -1
Answer:
Minimum cycle time = time for longest task = 2.4 minutes
Maximum cycle time = sum of the times to complete all the tasks = 18 minutes
Step-by-step explanation:
For the minimum cycle time, the reasoning is that all the tasks can be done simultaneously, at some during the assembling task. Hence, minimum time to complete one cycle is the time it takes to complete task that takes the longest time to complete.
For the maximum cycle time, the reasoning here is that each task is done after the completion of the previous task. The total time taken to finish the task will then be the sum of the time taken to complete each task. This usually is at the beginning of operations.
Answer:
A (2, -8/5)
Step-by-step explanation:
The answer would be A I believe. This is because to get from C to D, it would be going down 6 and to the right by 10.
To make CP = 3/5CD. We multiply how much we move by 3/5:
-6 * 3/5 = -18/5 (note that the 6 would be negative because its going down)
and 10 * 3/5 = 6
Then we add these values to the coordinates of C:
(-4 + 6, 2 - 18/5) =
(2, -8/5). So A would be the answer.
Answer:
False
Step-by-step explanation:
2x+7=30
2x=23
X= 23/2 or 11.5
X does not equal 3, therefore the statement is false
✨Answer:
✨:P (X) is 7/10P(not X) is 3/10 The total is 10 so that's ur denominator The probability of landing on a grey area is 7/10✨
Step-by-step explanation:✨
✨~hope this helps~✨
✨GOD LOVES YOU✨