Answer should be B.3 hopefully
Answer:
The correct answer is C) Electrical Contractor
Explanation:
EWR refers to <em>Electrical Work Request.</em>
According to the EWR Specifications, the Contractor is responsible for picking up and disposing of debris or rubbish from equipment installed by the electrical contractor on the project.
The EWR specification state that:
For the disposal of building waste materials, and garbage, the contractor shall have on-site enclosed dumpsters or bins and shall regularly eliminate the items referred to above from the site.
Cheers
Answer:
b. Technician B only
Explanation:
A watchdog timer is a circuit that automatically monitors the MCU (Microcontroller Unit) for any anomaly, detects it and helps the MCU to recover from the malfunction it has detected.
If the input signal turn-on time is too fast for the input circuit, that is a malfunction and this activates the watchdog timer circuit to correct this malfunction immediately. So Technician B only is correct as the watchdog timer is activated immediately once there is a malfunction.
Answer:
Cc= 12.7 lb.sec/ft
Explanation:
Given that
m = 22 lb
g= 32 ft/s²
x= 4.5 in
1 in = 0.083 ft
x= 0.375 ft
Spring constant ,K
K= 58.66 lb/ft
The damper coefficient for critically damped system
Cc= 12.7 lb.sec/ft