Answer:
The price of ribbon is $0.63 per meter.
Step-by-step explanation:
It is given that:
Cost of 3 meter ribbon = $1.89
Unit price per meter = 
Unit price per meter = $0.63 per meter
Therefore,
The price of ribbon is $0.63 per meter.
Answer:
D. 3/2
Step-by-step explanation:
The scale factor is 1/2 from OP / NQ = 1/2. Because of that, MQ is equal to half of MP and QP is equal to half of MP. Therefore, QP = MQ = 2. The slope of MO is rise over run which is 6 / 4 or 3 / 2.
The length of a segment is the distance between its endpoints.

- AB and CD are not congruent
- AB does not bisect CD
- CD does not bisect AB
<u>(a) Length of AB</u>
We have:


The length of AB is calculated using the following distance formula

So, we have:


Simplify

<u>(b) Are AB and CD congruent</u>
First, we calculate the length of CD using:

Where:


So, we have:



By comparison

Hence, AB and CD are not congruent
<u>(c) AB bisects CD or not?</u>
If AB bisects CD, then:

The above equation is not true, because:

Hence, AB does not bisect CD
<u>(d) CD bisects AB or not?</u>
If CD bisects AB, then:

The above equation is not true, because:

Hence, CD does not bisect AB
Read more about lengths and bisections at:
brainly.com/question/20837270
Answer:
B
Step-by-step explanation:
2a+45=180
subtract 45 from both sides which equals 2a=135
divide both sides by 2 which would solve for a.
Answer: 75
15 multiplied by 5 (how many times it takes 20 to get to 100) gives us 75 :)