Answer:
Activity Rates
Consultation $150
Drawings $58
Modeling $0.7
supervision $190
Billings $1037.5
Collections $1642.5
Total overhead allocated: $ 126,826
Explanation:
First, we divide the cost of each activity over the base total to get the rate.
![\left[\begin{array}{ccccc}$Activity&Driver&cost&Total&Rate\\$Consultation&$contact hours&315000&2100&150\\$Drawings&$desing hours&104400&1800&58\\$Modeling&$square feet&32200&46000&0.7\\$supervision&$days&228000&1200&190\\$Billings&$jobs&8300&8&1037.5\\$Collections&$jobs&13140&8&1642.5\\\end{array}\right]](https://tex.z-dn.net/?f=%5Cleft%5B%5Cbegin%7Barray%7D%7Bccccc%7D%24Activity%26Driver%26cost%26Total%26Rate%5C%5C%24Consultation%26%24contact%20hours%26315000%262100%26150%5C%5C%24Drawings%26%24desing%20hours%26104400%261800%2658%5C%5C%24Modeling%26%24square%20feet%2632200%2646000%260.7%5C%5C%24supervision%26%24days%26228000%261200%26190%5C%5C%24Billings%26%24jobs%268300%268%261037.5%5C%5C%24Collections%26%24jobs%2613140%268%261642.5%5C%5C%5Cend%7Barray%7D%5Cright%5D)
Now we apply this rate against the job activity measurement:
![\left[\begin{array}{ccccc}$Activity&Job&$Rate&$Allocated\\$Consultation&410&150&61500\\$Drawings&352&58&20416&\\$Modeling&7400&0.7&5180&\\$supervision&195&190&37050&\\$Billings&1&1037.5&1037.5&\\$Collections&1&1642.5&1642.5&\\$Total&&&126826&\\\end{array}\right]](https://tex.z-dn.net/?f=%5Cleft%5B%5Cbegin%7Barray%7D%7Bccccc%7D%24Activity%26Job%26%24Rate%26%24Allocated%5C%5C%24Consultation%26410%26150%2661500%5C%5C%24Drawings%26352%2658%2620416%26%5C%5C%24Modeling%267400%260.7%265180%26%5C%5C%24supervision%26195%26190%2637050%26%5C%5C%24Billings%261%261037.5%261037.5%26%5C%5C%24Collections%261%261642.5%261642.5%26%5C%5C%24Total%26%26%26126826%26%5C%5C%5Cend%7Barray%7D%5Cright%5D)
$29,150 is the correct answer
$26,550 + $1500 + $400 + $700 = $29,150
Answer:
The correct answer is A.
Explanation:
Giving the following information:
Activity Cost Pool Activity Measure Total Cost Total Activity
Machining Machine-hours $330,000 15,000 MHs
To calculate the predetermined manufacturing overhead rate we need to use the following formula:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
<u>Machinning:</u>
Predetermined manufacturing overhead rate= 330,000 / 15,000
Predetermined manufacturing overhead rate= $22 per machine-hour
<u>Machine setups:</u>
Number of setups $50,000 100 setups
Predetermined manufacturing overhead rate= 50,000/100
Predetermined manufacturing overhead rate= $500 per set-up
Answer:
Inventory $16,933
Notes receivable—due before December 31, 2018 368
Debt investments (short term) 2,008
Accounts receivable 5,785
Cash 9,215
Explanation:
Current Assets Section consists of Asset items that can be converted into cash within the period of 12 months.
Conversion happens in order of liquidity. Which means how much cash can be realized from conversion of a non-monetary asset in short term.
The order is given as <em>below</em>:
Inventory $16,933
Notes receivable—due before December 31, 2018 368
Debt investments (short term) 2,008
Accounts receivable 5,785
Cash 9,215