1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Ipatiy [6.2K]
3 years ago
13

Project managers frequently face competing constraints. Identify these common constraints and describe approaches that project m

anagers can use to make the trade-offs required to succeed.
Business
1 answer:
gizmo_the_mogwai [7]3 years ago
6 0

Answer: The common constraints faced by project managers are project scope, cost and time.

Explanations:

The three main constraints faced by project managers are the project scope, cost and time. These constraints affect the quality of a project. In high quality projects, the product is delivered within its scope at the required budget and on time.

The constraints are usually connected to one another. For example, an increase in the project scope will require an increase in cost and time. Also, accelerating the project timeline may lead to a reduction in the project costs but also lower the scope.

A trade off in project occurs when one constraint is reduced so as to increase another constraint. For trade-offs to be successful, project managers should take time to scrutinize the organization's objectives and the expectations of the project by using a structure that allows the project manager look at other options for the constraints and find the greatest balance among the constraints and organizational goals.

You might be interested in
Your manager has asked you to recommend which of two new types of digital camera to buy for your company's publications departme
Marysya12 [62]
D. Scholarly article.
The scholarly article is most likely to be a reputable source, since the author is educated in the manner of what you are needed. The scholar is most likely to know what you are needing to know.
5 0
3 years ago
Rebotar Inc. makes basketballs. Their fixed costs are $3,450. Variable costs are $12 per basketball. If the basketball is priced
JulsSmile [24]

Answer:

yes

Explanation:

The contribution margin concept uses the formula below to calculate the break-even point.

break-even = fixed cost/ contribution margin per unit

fixed costs = $3,450.

contribution margin per unit = sales price - variable costs

= $25- $12

=$13

Break-even = $3,450 /$13

=265.38

=265 units

The break-even point is 265 units. Rebotar Inc. sold 300 basketballs; they meet the break-even point. 300 basketballs are more than 265.

8 0
3 years ago
What is said to exist when total demand equals total supply in a transportation problem? an equilibrialized problem a balanced p
ss7ja [257]

Answer:

a balanced problem

Explanation:

  • In the transportation problem, when the total supply is greater than the total demand than we will say that the problem is unbalanced and
  • when total demand equals total supply in a transportation problem that then we will say that the problem is balanced.
  • so here here correct option is : a balanced problem
8 0
3 years ago
You are considering investing in a bank account that pays a nominal annual rate of 7%, compounded monthly. If you invest $3,000
vlada-n [284]

Answer: 81.1 months

Explanation:

You can use the NPER function on Excel to calculate this:

Rate = 7%/12 months = 7%/12

Pmt = -3,000 to represent the monthly deposit

FV = 310,000

Number of months should be: 81.1 months

5 0
3 years ago
Eastman Publishing Company is considering publishing an electronic textbook about spreadsheet applications for business. The fix
Anika [276]

Answer:

I prepared an excel spreadsheet which includes the income model and an example.

Explanation:

Download xlsx
8 0
3 years ago
Other questions:
  • Consumer surplus
    14·1 answer
  • Many new restaurants have opened in Collegetown in recent years. Given this change in supply, what type of demand would result i
    12·2 answers
  • Examples of _____ controls include production quality control and internal auditing. feedforward feedback vertical horizontal id
    6·1 answer
  • Michael wanted to build a small princess castle for his daughter in the backyard. He decided to turn it into a do-it-yourself pr
    7·1 answer
  • During the year, Pablo keeps the following record of his travel: Miles Home to office 864 Office to home 864 Home to local clien
    5·2 answers
  • This exit strategy allows the entrepreneur an opportunity to buy back venture capital stock at cost and an additional premium. a
    12·1 answer
  • When tailoring a résumé, what is the first step that should take place? a. Arrange your résumé with the most relevant informatio
    15·2 answers
  • Two firms, A and B, each currently emit 100 tons of chemicals into the air. The government has decided to reduce the pollution a
    8·1 answer
  • 23
    7·1 answer
  • Developmental tasks: question 1 options: a) always involve children. b) occur at all stages of the life cycle. c) always impede
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!