Calculate LER for a rectangular wing with a span of 0.225m and a chord of 0.045m. The weight of the glider is 0.0500 Newtons. (Note: the wing span is the width of the wing and is measured from wing tip to wing tip, or perpendicular to the fuselage. The wing chord is the length of the wing measured parallel or along the length of the fuselage.)
Answer:
Area of rectangular wing = span × chord = 0.225×0.045= 0.010125m2
LER = Area/weight = 0.010125/0.0500 = 0.2025
Answer:
1.Execution Unit. 2.Bus interface unit
Explanation:
Answer:
Explanation:
Let's do this in Python. We will loop through 4 times, each of the loop would compute the dividend, store it as string in a result variable and finally print the result on the same line:
def divide_4_times(user_num, x):
result = ''
for i in range(4):
user_num /= x
result += (' ' + str(user_num))
print(result)
Answer: A) the overarching policies and processes to optimize and leverage information while keeping it secure and meeting legal and privacy obligations in alignment with organizationally stated business objectives
Explanation: Information governance(IG) is the act for the information to store , create, archive,deleting, valuing etc.This step is used for making the information secure and optimizable when required. IG gives the control over the information with respect to particular policy.
Other options are incorrect because frameworks used for extraction of most of IT investments is known as IT(Information technology ) governance and method used for ensuring the data for forming database is known as data governance .Thus, the correct option is option(A).