The answer would be D. It says the length is 10 millimeters less than TWICE the width, so it would be 10 millimeters greater than the original width.
Answer:
3 days
Step-by-step explanation:
This can be seen under Schedule management (Initiating)
Project float is simply the difference between the completion period externally imposed and the estimated time duration of the project (usually this is equal to the critical path length). The difference in this case is 0 because
Externally imposed project date = 75 days
Estimated duration of project = 75 days
Hence, a difference in these will be 0
However, a standard deviation of 3 days was giving (This implies that there is a +/- 3 days in the critical path from the estimated project duration)
.
Hence the maximum float in this case will be 0 + 3 = 3 days
33+11+55/3
so 33+11=44
44+55=99 now divide 99 by 3 to get 33
Answer:
B. -4.
Step-by-step explanation:
Answer:
Step-by-step explanation:
If the measures of angles 1 and 2 are congruent, then the measures of 3 and 4 should also be congruent because they are vertical angles.