Answer:
1. A, 2 meters per second
2. F, 15
Answer:
Using a Graph of a Line Identify the x-axis. A coordinate graph has a y-axis and an x-axis. The x …
Using the Equation of the Line Determine that the equation of the line is in standard form. The …
Using the Quadratic Formula Determine that the equation of the line is a quadratic equation. A
Step-by-step explanation:
Assuming the man works 8 hours straight without breaks:
25% is the same as 1/4 of something.
So, we just have to figure out what 1/4 (one quarter) of 8 equals.
You can think of it as a pizza cut into 8 slices. One slice is equivalent to one hour for the patrolman.
If we take away 1/2 (half) of the pizza, we have 4 slices, right? Since we start with 8 slices, half of that equals 4 slices. In other words, 50% (half) of the pizza = 4 slices.
Now, 25% (one quarter) of the pizza will equal half of what is left:
If we know that 50%=4 slices (or 4 hours), then 25% must be 2 slices (or 2 hours).
That's it! 25% of 8 hours = 2 hours.
***So, the patrolman spends 2 hours each day completing paperwork.***
Lets check our work:
We know 8 hours (or 8 slices)= 100%
(We know this because
8 slices = 1 whole pizza, or 100% of a pizza. Similarly,
8 hours = 1 whole shift or 100% of the man's shift ).
So
25% + 25% + 25% + 25% = 100%
If 100% of the mans shift = 8 hours:
2+2+2+2 = 8
It checks out!
Hope this helps!
I will do my best to explain this “ x method “ I use
Basically, two factors of the first and last number must multiply together to sum up to equal the middle number
1 X 12
1 4
(x+12) (x+4)
Hope this helps!