1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Tom [10]
3 years ago
10

The sum of two numbers is 34. The difference of the two numbers is 14. Find the two numbers.

Mathematics
2 answers:
harkovskaia [24]3 years ago
6 0

Answer:24 and 10

Step-by-step explanation:24-10=34 24-10=14

kotegsom [21]3 years ago
6 0
Someone already answered but yes it would be: 24 and 10. 24 + 10 = 34 and 24 - 10 = 14 Both equations math the problem. That’s your answer!
You might be interested in
How do you write 0.05 times 10=0.5 as division
yaroslaw [1]

0.05 * 10 =0.5

If you want an equivalent expression as division simply divide both sides by either 0.05 or 10 and it'll be dividing:

10 = 0.5/0.05 OR 0.05 = 0.5/10

4 0
3 years ago
In the right -angled tringles began the ABC in the ED :8cm ,and DC :10cm then the length of the air
fgiga [73]
ED:8cm,DC:10 so the air is HD:18
7 0
3 years ago
a worker A finishes a project on his own in 12 days. the worker completes the same work alone in 16 days. the two workers starte
ankoles [38]

Answer:

<em>Worker B needs 9 days to finish the rest of the work</em>

Step-by-step explanation:

<u>Proportions</u>

Worker A finishes a project on his own in 12 days and worker B does the same in 16 days.

Worker A does 1/12 of the project in one day and worker B does 1/16 of the project in one day. When working together, they do

\frac{1}{12}+\frac{1}{16}=\frac{7}{48}

After 3 days they have completed:

3*\frac{7}{48}=\frac{7}{16}

parts of the project, this means it still remains:

1-\frac{7}{16}=\frac{9}{16}

parts of the project and it is done by B alone. Since B does \frac{1}{16} per day, he now takes

\displaystyle \frac{\frac{9}{16}}{\frac{1}{16}}=9

days to complete the project.

Worker B needs 9 days to finish the rest of the work

4 0
3 years ago
Please help me out! Which one is it.
Valentin [98]

Answer:

b is answer?

Step-by-step explanation:

feels right

5 0
3 years ago
On the first day of spring, an entire field of flowering trees blossoms. The population of locusts consuming these flowers rapid
Elza [17]

Answer:

L(t)=7600e^{0.2273t}

Step-by-step explanation:

-The locust population grows by a factor and can therefore be modeled by an exponential function of the form:

P=P_oe^{rt}

Where:

  • P is the population after t days.
  • P_o is the initial population given as 7600
  • r is the rate of growth
  • t is time in days

-Given that the growth is by a factor of 5( equivalent to 500%), the r value will be 5

-The population increases by a factor of 5 every 22 days. therefore at any time instance, t will be divided by 22 to get the effective time for calculations.

Hence, the exponential growth function will be expressed as:

P=P_oe^{rt},\ \ \ P=L(t)\\\\\therefore L(t)=7600e^{5\frac{t}{22}}\\\\=7600e^{0.2273t}

7 0
3 years ago
Other questions:
  • PLEASE ANSWER QUICKLY!!!
    9·1 answer
  • Aidan is 68 inches tall. The average height of students in his class is 65 inches with a standard deviation of 3.6 inches. What
    6·1 answer
  • What multiplies to 20 and adds up to 9?
    13·2 answers
  • What is the length (magnitude) of vector (-4,2)
    12·1 answer
  • Simplify<br> (4^7/5^2)^3
    8·2 answers
  • If the perimeter of the semicircle is 10.28mm. What is the semicircles radius?
    11·1 answer
  • If j = 10 cm and k = 12.5 cm what is the length of l
    5·1 answer
  • Find the slope of the line that is perpendicular to the joining line P (2,-3) and Q (-3,-2)
    13·1 answer
  • PLEASE HELP 5. Find the distance of the line segment joining the two points: (2,0) (0,-2)
    10·1 answer
  • The sum of eight and twice a number is 42
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!