Answer:
3/4 or 0.75
Step-by-step explanation:
I don’t get all the other stuff but 1/4 + 1/2 = 3/4
Answer:
Option B) 16
Step-by-step explanation:
We are given the following in the question:

where x is the student's original test score and y is the student's adjusted test score.
We have to find the standard deviation of the adjusted test scores of the students in the class, if the standard deviation of the original test scores of the students in the class was 20.
We know that:
- Adding a constant to each value in a data set does not change the value of the standard deviation.
- Multiplying each value in a data set by a constant also multiplies the standard deviation by that constant.
Thus, if we add 20 to each data set then, the standard deviation does not change.
But multiplying each score by 0.8, changes the standard deviation 0.8 times.
Thus, we can write:

Thus, standard deviation of adjusted score is 16.
Well, if you use the net diagram, the one below the pyramid, this is how to do it:
First, find the area of the square, or the base. That would be 10 * 10 = 100ft.
Then, you find the areas of all of the triangles, which is this formula: A= BH / 2.
So you would do 10 * 12 / 2 for each triangle, or you can just make them squares, since there are four triangles, and it would turn into 10 * 12 * 2 for all of them. That was just an easier way to figure it out, but you could have done each triangle and then added them all up.
Finally, add what you get for the triangles, 240ft, with the area of the square, 100ft. You get 340ft².
Your answer will be 340ft².
Hope this helped!
You do what is asked for in the parentheses then multiply by the number outside of them.
Then Jim has to be very careful and cautious about it