Answer:
105 girls
Step-by-step explanation:
the ratio is 5:3 equal to 168. You need to multiply the ratio with 21 to make it equal
Answer:
Project A: $55,000 Project B: $50,800 Contractor should choose project A
Step-by-step explanation:
The expected value of the project is the sum of products of profit and its probability:
In thousands, ...
A: (50×0.6) +(80×0.3) +(10×0.1) = 30 +24 +1 = 55 . . . thousand
B: (100×0.1) +(64×0.7) +(-20×0.2) = 10 +44.8 -4 = 50.8 . . . thousand
__
The contractor should choose Project A based on the expected value of profit.
Answer:
The value of k will be -4
Step-by-step explanation:
We have given polynomial 
It is given that x+1 is factor of the polynomial
And we have to find the value of k
As x+1 is the factor of polynomial so x+1 = 0 that is x = -1 will be the root of polynomial
So if we put x = -1 in the polynomial then the p(-1) will be zero
So 

So the value of k will be -4
Answer:
The answer is x+6
Step-by-step explanation:
The Y intercept from the translated unit and the one before are 6 units apart
Answer:
perimeter is 34
area is 72
Step-by-step explanation:
side lengths are 8,8,9,9
add all 4 up to get perimeter of 34
area is 9x8 which is 72