Answer:
if it was for mike and them 292 but if it was just those two then 438
Step-by-step explanation:
Step-by-step explanation:
1st term = 8-1 = 7
2nd term = 8-2 = 6
3rd term = 8-3 = 5
First negative term = 8-(-1) = 9
Answer:
A minimum of 21250 packets per day.
Step-by-step explanation:
If Monday produced 15,000 packets, and Tuesday was closed they produced 15,000 packets in 2 days.
The factory is open 6 days a week.
They need 100,000 packets.
They have 15,000 packets.
6 subtract 2 is 4.
100,000 subtract 15,000 is 85,000.
They need 85,000 packets in 4 days.
That is a minimum of 21250 packets per day.
Answer:
(-6)(-5)(3)(-2)(4) = -720
Step-by-step explanation:
-6 time -5 is positive 30 beacuse 2 negatives make a positive
30 times 3 is 90
90 time -2 is -180 because a negative times a positive is a negative
-180 times 4 is -720 :)
You round them to the nearest whole number which makes it 7-5 this means the best estimate is 2