9 7/8 written as a decimal is 9.88
Work: So, The first thing I did was 9 (Whole Number) times the Denominator. After the Multiplication, I had gotten 72. I added 72 by the numerator which is 79. Then, I divided 79 by the denominator, and I had gotten 9.875, and I rounded it up to 9.88
I hope this helps, and you get this question correct. :)
the answer is A.
<em>Credit markets increase in a strong economy, and with increased demand come increased prices.</em>
Answer: 1 hour 20 minutes
Step-by-step explanation:
Given : The old machine could shred a truckload of paper in 4 hours.
Rate of work done by old machine = 
The new machine could shred the same truckload in 2 hours.
Rate of work done by new machine = 
Let 't' be the time taken by both of them working together , then we have the following equation:-

Since 1 hour = 60 minutes
Then, 
Hence, it will take 1 hour 20 minutes to shred the same truckload of paper if Ron runs both shredders at the same time.