Answer:
41.94% probability that a worker earned between $400 and $500.
Step-by-step explanation:
Problems of normally distributed samples can be solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

What is the probability that a worker earned between $400 and $500?
This is the pvalue of Z when X = 500 subtracted by the pvalue of Z when X = 400. So
X = 500



has a pvalue of 0.7422
X = 400



has a pvalue of 0.3228
So there is a 0.7422 - 0.3228 = 0.4194 = 41.94% probability that a worker earned between $400 and $500.
1) we calculate the area of the swimmning pool
area of this swimming pool=(22ft)(28 ftt)=616 ft².
2) we calculte the total area of the swimming pool + area of the walkway
Total area=area of the swimming pool + area of the wakway
Total area=616 ft²+336 ft²=952 ft².
3) we can suggest this equation :
x=width
(22+2x)(28+2x)=952
616+44x+56x+4x²=952
4x²+100x-336=0
x²+25x-84=0
x=[-25⁺₋√(625+366)]/2=(-25⁺₋31)/2
we have two solutions:
x₁=(-25-31)/2=-28 this solution is not valid.
x₂=(-25+31)/2=3
Answer: the width of the walkway is 3 ft.
Answer:
A. 41
Step-by-step explanation:
Look at the number 6 and follow the line until it shows you the number, which 41
C.
The graph shows that it’s going 8 miles per hour, due to the number that the line is on.