Answer:
3, 15, 14
Step-by-step explanation:
x + 5x + ( 5x -1) = 32
11x - 1 = 32
11x = 32 + 1
11x = 33
11x/11 = 33/11
x = 3
therefore
the first number is 3
the second is 5 × 3 = 15
the third number is 15 - 1 = 14
Answer:
20/7 days (just less than 3 days)
Step-by-step explanation:
Recall that (1 job) = (rate)(time), so time = (1 job) / (rate).
Set up and solve the following equation:
1 job
------------------------------- = time required for 2 pumps working together
1 job 1 job
---------- + -------------
4 days 10 days
This comes out to:
1 job
------------------------------------------- = time required
10 job-days 4 job-days
------------------ + -----------------
40 days 40 days
or:
1 job
-------------------- = (40/14) days, or 20/7 days (just less than 3 days)
14 job·days
-----------------
40 days
You would need two different lines to complete this as lines cannot be both parallel and perpendicular (these are opposites). The answers would be:
Parallel: x = 2
Perpendicular: y = -2
In order to find these, we first need to see that the original line of x = -1 is a horizontal line. Therefore, any line that is parallel should be horizontal as well. To get a horizontal line through the point (2, -2), the only option is x = 2.
Similarly, with the perpendicular line, if the original line is horizontal, the new line must be vertical. The only vertical line that goes through (2, -2) is y = -2.
Since you have to distribute both numbers, you'll end up with x^2-3x+4x-12 then simplify and it is x^2+x-12
Answer:
3.5/1 (or just 3.5)
Step-by-step explanation:
If y = a/n, then the constant proportionality is 3.5/1 or 7/2
Think of this as "rise over run" (we are basically finding the slope)