Answer:
A:
![|7-x|](https://tex.z-dn.net/?f=%7C7-x%7C%3C4%5C%5C)
B:
With absolute value equations, you can make two equations.
![|7-x|-4\\xx>11](https://tex.z-dn.net/?f=%7C7-x%7C%3C4%5C%5C1%29%207-x%3C4%5C%5Cx%3E3%5C%5C2%297-x%3E-4%5C%5Cx%3C11%5C%5C3%3Ex%3E11)
Step-by-step explanation:
If x is the mass of 30% copper alloy, and y is the mass of 65% copper alloy, then:
x + y = 80
0.30x + 0.65y = 0.51(80)
Solving the system of equations using substitution:
0.30x + 0.65(80 − x) = 0.51(80)
0.30x + 52 − 0.65x = 40.8
11.2 = 0.35x
x = 32
y = 80 − x
y = 48
The metalworker needs 32 kg of 30% copper alloy and 48 kg of 65% copper alloy.
Answer:
t=(37+root89)/32,(37-root89)/32
Step-by-step explanation:
Solve the equation:
23=3+37t-16t^2
Answer: 105 meters
Step-by-step explanation:
Ostrich's running rate is 63 meters/3 seconds. This can be reduced to 21 meters/second (21 m/s).
(21 m/s)*(5 sec) = 105 meters